Appendix

ADDITIONAL DOCUMENTS

In 1995 I discovered that my father and uncle were victims of Nazi medical experiments. Dr. Carson Phillips of the Neuberger Holocaust Centre in Toronto found documents showing their names on a July 1944 selection list in the Auschwitz archives.

This and the following letter demostrate the dispassionate and mechanical approach of the engineers and SS officials involved in the logistics of mass murder.

Translation:

[Top left: Rubber stamp of the Topf management secretariat, dated 6th December 1941, with the initials of the directors: LT for Ludwig Topf and ET for Ernst-Wolfgang Topf, and the inscription for reply and replied on]

Erfurt, 6th December 1941

To Messrs

Ludwig and Ernst Wolfgang Topf

Inside the house

Dear Messrs Topf,

As you know, I designed both the 3 muffle and 8 muffle cremation furnaces, and this using mainly my free time—at home.

These furnace constructions pioneer the way for the future and I venture to hope that you will grant me a bonus for the work involved.

Heil Hitler!

Kurt Prüfer

On the order of LT/ET,

150 RM paid 24/12/41

[Initials]

(Braun), agreed

? must discuss

T

Translation:

[Manuscript] SS Second Lieutenant (Specialist) Kirschnick!

Copy

29th January, 1943

Correspondence register no 22250/43/Bi/L

Subject: Krematorium II. State of construction

Reference: SS-WVHA telegram 2648 of 28/1/43

Enclosure: 1 Inspection Report

Head of Amstgruppen C

SS Lieutenant-General and Waffen SS Major-General

Dr Ing (Engineer) Kammler

Berlin Lichterfelde West

Unter den Eichen 126-135

Krematorium II has been completed but for minor details, thanks to employing all available forces, despite enormous difficulties and freezing weather, using day and night shifts. The furnaces have been lit in the presence of Herr Chief Engineer Prüfer of the firm responsible for their construction, Topf & Sons of Erfurt and they function perfectly. Because of the frost, it has not yet been possible to remove the formwork from the ceiling of the corpse cellar. This is of no consequence, however, as the gassing cellar can be used to this end [i.e. a morgue].

Because the wagons are blocked, Messrs Topf & Sons have not been able to deliver on time the ventilation and air extraction installations as required by the Bauleitung. These will be fitted as soon as they arrive, so that it is probable that the installation will be entirely ready for service on the 20th February 1943.

Please find enclosed a report by the inspecting engineer of Topf & Sons, Erfurt.

Head of the Auschwitz Waffen SS and Police

Central Construction Management

[Signed] Bischoff

SS Captain

Distribution:

1 SS Second Lieutenants Janisch and Kirschneck

1 Registration

For Archives

[Signed] Pollok

SS Second Lieutenant (S)