The construction of the Metropolitan Railway, now the Metropolitan Line, using the cut and cover method caused whole streets to be closed, with considerable congestion on side streets. Yet, building beneath the surface was the only way, and cut and cover was only viable if the streets were reasonably wide and straight. Even so, notice damage to the buildings on the left in lower image. (Author’s collection)