[1] Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants—Final Summary Report, NUREG-1150, U.S. NRC, 1990.
[2] U.S. NRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants (LWR Edition), Revision 3, as reviewed on September 2014.
[3] U.S. NRC Regulatory Guide 1.26, Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants, Revision 1, September 1974.
[4] U.S. NRC Regulatory Guide 1.26, Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants, Revision 4, as reviewed on March 2013.
[5] 10CFR50.55a Codes and standards, 36 FR 11424, Jun. 12, 1971 with last amendment at 80 FR 45843, Aug. 3, 2015.
[6] NUREG-0800 Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition, Section 3.2.2 System Quality Group Classification, U.S. NRC, Draft Rev. 3, August 2015.
[7] NEI 97-04, Revised Appendix B, Guidance and Examples for Identifying 10 CFR 50.2 Design Bases, Nuclear Energy Institute, November 2000 (http://adams.nrc.gov/wba/, Accession No.: ML003771698, as of July 15, 2016).
[8] U.S. NRC Regulatory Guide 1.186, Guidance and Examples for Identifying 10 CFR 50.2 Design Bases, as reviewed on June 2011.
[9] Fullwood, R. R., Hall, R. E., Probabilistic Risk Assessment in the Nuclear Power Industry, Fundamentals and Applications, Pergamon Press, 1988.
[10] Henley, E. J., Kumamoto, H., Reliability Engineering and Risk Assessment, Prentice-Hall, Inc., 1981.
[11] Barlow, R. E., Proschan, F., Statistical Theory of Reliability and Life Testing: Probability Models, Holt, Rinehart and Winston, Inc., 1975.
[12] Vesely, W. E. et al., Measures of Risk Importance and Their Applications, NUREG/CR-3385, Battelle Columbus Laboratories/U.S. NRC, 1983.
[13] Vesely, W. E. et al., Fault Tree Handbook, NUREG-0492, U.S. NRC, 1981.
[14] Papazoglou, I. A. et al., Probabilistic Safety Analysis Procedures Guide, NUREG/CR-2815, Brookhaven National Laboratory/U.S. NRC, 1984.
[15] ASME/ANS RA-Sa–2009, Addenda to ASME/ANS RA-S–2008 Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications, An American National Standard, The American Society of Mechanical Engineers, 2009.
[16] 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, 69 FR 68047, Nov. 22, 2004.
[17] NEI 00-04, 10 CFR 50.69 SSC Categorization Guideline, Revision 0, Nuclear Energy Institute, July 2005 (http://adams.nrc.gov/wba/, Accession No.: ML052900163, as of July 15, 2016).
[18] U.S. NRC Regulatory Guide 1.177, An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications, Revision 1, May 2011.
[19] 10CFR50.65, Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, 56 FR 31324, July 10, 1991 with last amendment at 72 FR 49501, Aug. 28, 2007.
[20] U.S. NRC Regulatory Guide 1.160, Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, Revision 3, May 2012.
[21] NUMARC 93-01, Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, Revision 4A, Nuclear Energy Institute, April 2011 (http://adams.nrc.gov/wba/, Accession No.: ML11116A198, as of July 15, 2016).
[22] Reactor Oversight Process, NUREG-1649, Revision 5, U.S. NRC, February 2014.
[23] NRC Inspection Manual Inspection Procedure 71111, Reactor Safety—Initiating Events, Mitigating Systems, Barrier Integrity, Issue Date: 10/28/11.
[24] Dube, D. A. et al., Independent Verification of the Mitigating Systems Performance Index (MSPI) Results for the Pilot Plants, NUREG-1816, U.S. NRC, February 2005.
[25] NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Nuclear Energy Institute, August 31, 2013 (http://adams.nrc.gov/wba/, Accession No.: ML13261A116, as of July 15, 2016).
[26] Cheok, M. C., Parry, G. W. and Sherry, R. R., Use of Importance Measures in Risk-Informed Regulatory Applications, Reliability Engineering and System Safety 60 (1998) 213–226, Elsevier Science Limited, 1998.
[27] Smith, C. L., Calculating Conditional Core Damage Probabilities for Nuclear Power Plant Operations, Reliability Engineering and System Safety 59 (1998) 299–307, Elsevier Science Limited, 1998.
[28] Kim, K., Kang, D. I. and Yang, J.-E., On the Use of the Balancing Method for Calculating Component RAW Involving CCFs in SSC Categorization, Reliability Engineering and System Safety 87 (2005) 233–242, Elsevier Ltd., 2005.
[29] Bäckström, O., Krcal, P. and Wang, W., Two interpretations of the risk increase factor definition. Risk, Reliability and Safety: Innovating Theory and Practice, Edited by Lesley Walls, Matthew Revie and Tim Bedford, Taylor & Francis Group, 6000 Broken Sound Parkway NW, Suite 300, Boca Raton, FL 33487-2742 CRC Press, pages 2816–2822, 2016.
[30] Wall, I. B. and Worledge, D. H., Some Perspectives on Risk Importance Measures, Proceedings of the International Topical Meeting on Probabilistic Safety Assessment: PSA ’96: “Moving toward Risk-Based Regulation”, September 29–October 3, 1996, Park City, Utah (general chair: James A. Lake), American Nuclear Society, La Grange Park, IL, USA, pages 203–207, 1996.
[31] Poloski, J. P. et al., Rates of Initiating Events at U.S. Nuclear Power Plants: 1987–1995, NUREG/CR-5750, INEEL/U.S. NRC, 1999.
[32] Martorell, S., Serradell, V. and Verdu, G., Safety-Related Equipment Prioritization for Reliability Centered Maintenace Purposes Based on a Plant Specific Level 1 PSA, Reliability Engineering and System Safety 52 (1996) 35–44, Elsevier Science Limited, 1996.
[33] Eide, S.A. et al., Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants, NUREG/CR-6928, Idaho National Laboratory/U.S. NRC, February 2007.
[34] Vesely, W. E., Supplemental Viewpoints on the Use of Importance Measures in Risk-Informed Regulatory Applications, Reliability Engineering and System Safety 60 (1998) 257–259, Elsevier Science Limited, 1998.
[35] NUREG/CR-4780, Procedure for Treating Common Cause Failures in Safety and Reliability Studies, Pickard, Lowe and Garrick, Inc., Prepared for US NRC – EPRI, 1988/1989.
[36] NUREG/CR-5845, Guidelines on Modeling Common Cause Failures in Probabilistic Risk Assessment, INEEL, University of Maryland, Prepared for US NRC, 1998.
[37] NUREG/CR-5497, Common Cause Failure Parameter Estimations, INEEL, University of Maryland, Prepared for US NRC, 1998.
[38] U.S. NRC Regulatory Guide 1.174, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, Revision 2, 2011.
[39] RiskSpectrum® Analysis Tools Theory Manual, Version 3.2.1, Scandpower AB 1984–2012.