Log In
Or create an account ->
Imperial Library
Home
About
News
Upload
Forum
Help
Login/SignUp
Index
Title Page
Copyright Page
Dedication
Table of Figures
List of Tables
Foreword
PREFACE
Acknowledgements
SPECIAL ACKNOWLEDGMENT
ACKNOWLEDGMENTS
SPECIAL THANKS
ABOUT THE AUTHORS
GEARY A. RUMMLER
ALAN J. RAMIAS
RICHARD A. RUMMLER
Introduction
OUTLINE AND PURPOSE OF THIS BOOK
WHO THIS BOOK WAS WRITTEN FOR
PART ONE - White Space Revisited
CHAPTER ONE - The Silver Anniversary of Process
CIRCA 1985
MILESTONES SINCE 1990
GENERAL RESULTS
CLOSING POINTS
CHAPTER TWO - Process in a Value Perspective
BASIC PREMISE: THE ORGANIZATION AS A SYSTEM
THE VALUE MACHINE
THE VALUE CREATION PERSPECTIVE
OVERVIEW OF THE VALUE CREATION HIERARCHY
KEY FEATURES AND BENEFITS OF THE VALUE CREATION HIERARCHY
CLOSING POINTS
CHAPTER THREE - The Value Creation Hierarchy
A DEFINITION OF PROCESS
VCS MILESTONES
NOW, A SECOND TRIP DOWN THE VCH
LEVEL 1: ENTERPRISE/BUSINESS
LEVEL 2: THE VALUE CREATION SYSTEM (VCS)
LEVEL 3: PROCESSING SUB-SYSTEMS
LEVEL 4: PROCESS
LEVEL 5: SUB-PROCESS/TASK/SUB-TASK
POTENTIAL PITFALLS IN CURRENT PRACTICES
CLOSING POINTS
CHAPTER FOUR - Developing the Value Creation Architecture of a Business
MAKING THE VALUE DIMENSION VISIBLE
A CLOSER LOOK AT VALUE CREATION ARCHITECTURE
WHY BOTHER DEVELOPING A VCA?
DEVELOPING THE VCA
CLOSING POINTS
CHAPTER FIVE - Process Management in the Value Creation Context
PERFORMANCE MANAGEMENT MODELS
CLOSING POINTS
PART TWO - Designing or Improving the Value Machine
CHAPTER SIX - A Framework and Methodology for VCS Design
MAJOR REQUIREMENT: A METHODOLOGY FOR THE VALUE CREATION SYSTEM
EVOLUTION OF THE METHODOLOGY
THE EFFECTIVE PROCESS FRAMEWORK (EPF)
RUMMLER PROCESS METHODOLOGY OVERVIEW
DESIGN DIMENSIONS
RPM ASSUMPTIONS
RPM ROLES
RPM CRITICAL SUCCESS FACTORS
CLOSING POINTS
CHAPTER SEVEN - RPM Project Walk-Through: Align, Analysis, Design
CLOSING POINTS
CHAPTER EIGHT - RPM Project Walk-Through: Commit, Build, Enable, Adopt
April 15-18
April 21-23
April 24-25
April 30
Commit Phase Summary
March-Mid-May
May-November
November-December
Build Phase Summary
Enable Phase Summary
January 5-March
Adopt Phase Summary
Project Summary and Timetable
CLOSING POINTS
CHAPTER NINE - Other RPM Applications
RPM AND OTHER PRACTICES
CLOSING POINTS
CHAPTER T E N - Designing Improvement Capability
INFRASTRUCTURE TO SUPPORT CHANGE
THE ROLE OF THE PERFORMANCE ARCHITECT
CLOSING POINTS
PART THREE - Implications
CHAPTER ELEVEN - Process and the IT Department
THE OPPORTUNITY FOR IT IN A PROCESS WORLD
BARRIERS TO SEIZING OPPORTUNITY
IMPLICATIONS
CHAPTER TWELVE - Summary
WHY THIS BOOK
THE “BIG IDEAS”
RPM METHODOLOGY
IMPLICATIONS
AFTERWORD
LIST OF ACRONYMS
NOTES
INDEX
ABOUT PERFORMANCE DESIGN LAB
← Prev
Back
Next →
← Prev
Back
Next →