Construction Steps for a 60m2 House
Introduction
Building Order
Tools Needed
Container Prep
Compressor tools (optional)
Painting
Stages of Building
1. Source Materials and Permits
2. Concrete Foundations
3. Locate First Fix Utilities
4. Prepare the Undersides
5. Place the Container
6. Sandblast or Grind
7. Cut Out and Install Windows
8. Weld the Container Tops Together
9. Create Opening and “Zipper Cut” Walls
10. Cut Out Internal Doors
11. Install Door Frames
12. Security Door Installation
13. Build Roof Gable Ends and Install Roof Purlins
14. Install Electrics
15. Prep the Container to Receive Insulation
16. Insulate the House
17. Spray Internal Insulation Gaps and Ceiling
18. Paint the Container Internally
19. Install Bathroom and Kitchen Plumbing
20. Second Fix Utilities
21. External Insulation
22. Paint or Render External Insulation
23. Roofing
24. Hang Doors and Install Glass
25. Install Bathroom Partition Wall and Tiling
26. Final Finishing and Flooring
Conclusion
Appendix 1: Costings from Cashbuild April 2014
Appendix 2 – Additional Visuals
A Note from the Author