Cover Title Page Copyright Page Dedication Contents Abbreviations List of Figures List of Tables List of Exhibits List of Equations Acknowledgements About the Authors Preface Foreword Chapter 1 Introduction
1.1. Introduction 1.2. The Problem with Megaprojects
1.2.1. Megaproject Risks 1.2.2. Megaproject Risk Assessment 1.2.3. A New Risk Assessment Framework
1.3. Purpose and Scope 1.4. Structure of the Book 1.5. Originality and Value 1.6. Summary
Chapter 2 The Edinburgh Tram Network (ETN) Project
2.1. Introduction 2.2. Background to the Project
2.2.1. The 1871–1956 Era 2.2.2. The New Edinburgh Tram Network 2.2.3. Tram Network Construction and Civil Engineering Works 2.2.4. Contractual Disputes
2.3. STEEP Risks
2.3.1. Social Issues 2.3.2. Technical Issues 2.3.3. Environmental Issues 2.3.4. Political Issues
2.4. Summary
Chapter 3 Megaproject Risks Assessment Framework
3.1. Introduction 3.2. Risk Analysis Framework
3.2.1. The ANP Modelling Route
3.2.1.1. ANP model structure development 3.2.1.2. Pairwise comparison 3.2.1.3. Consistency test
3.2.2. The SD Modelling Route
3.3. Risk Clusters
3.3.1. The Social Risks Cluster 3.3.2. Technical Risk Cluster 3.3.3. Economic Risks
3.3.3.1. Completion risks 3.3.3.2. Market risk
3.3.4. Environmental Risk Cluster 3.3.5. Political Risk Cluster
3.4. Summary
Chapter 4 Megaproject Risk Quantification
4.1. Introduction 4.2. Analysis of Risk Interdependency
4.2.1. Qualitative Approaches 4.2.2. The Quantitative Approach 4.2.3. Descriptive Quantitative Results and Analysis 4.2.4. Standardized Quantitative Results and Analysis 4.2.5. Adjustments of Participants’ Opinions
4.3. ANP Model 4.4. Pairwise Comparison 4.5. Risk Interdependency Matrix
4.5.1. Project Objectives Cluster 4.5.2. Potential Risks Cluster 4.5.3. Potential Risks Sub-Clusters
4.6. Supermatrix Calculation 4.7. Risk Rating 4.8. Consistency Test 4.9. Risk Priority Index (RPI) 4.10. Summary
Chapter 5 Risk Simulation
5.1. Introduction 5.2. Project Risk Systems Model
5.2.1. Model Causality 5.2.2. Initial Model Development 5.2.3. System Boundaries
5.3. STEEP Risks System
5.3.1. Social Risks System
5.3.1.1. The vicious cycle of social risks generation 5.3.1.2. The vicious cycle of grievance prevention 5.3.1.3. Causalities for social risk stock variables
5.3.2. Technical Risks System
5.3.2.1. Causalities for technical risk stock variables
5.3.3. Economic Risks System
5.3.3.1. Causalities for the economic risks stock variables
5.3.4. Environmental Risks System
5.3.4.1. Causalities for environmental risks stock variables
5.3.5. Political Risks System
5.3.5.1. Causalities for political risks stock variables
5.4. System Verification 5.5. System Modelling, Testing and Simulation
5.5.1. Integrated Stock and Flow STEEP Models 5.5.2. Model Equation Formulation 5.5.3. Model Evaluation Tests 5.5.4. Dynamic Simulation Results and Discussion
5.5.4.1. Dynamic social risks system model 5.5.4.2. Dynamic technical risks system model 5.5.4.3. Dynamic economic risks system model 5.5.4.4. Dynamic environmental risks system model 5.5.4.5. Dynamic political risks system model
5.6. System Validation
5.6.1. Structure Verification 5.6.2. Parameter Verification 5.6.3. Boundary Adequacy 5.6.4. Dimensional Consistency
5.7. Summary
Chapter 6 Conclusions
6.1. Introduction 6.2. Value for Practice 6.3. Contribution and Impacts 6.4. Practical Guide 6.5. Limitations and Further Research
6.5.1. Limitations 6.5.2. Further Research
References Appendices
Appendix A Model Validation
Introduction Philosophical Aspects of Model Validity Model Validation Process Methods for Testing and Validating the Integrated System Models Importance of the Integrated System Model Objective Validating the Model Structure Tests of Suitability
Structure Verification
Parameter Verification Boundary Adequacy Dimensional Consistency Extreme Conditions Validating the Model Behaviour
Behaviour Reproduction Test
Sensitivity Analysis Numerical Sensitivity Analysis Behaviour Mode Sensitivity Analysis Other Tests Policy Analysis, Design and Improvement Feedback Approach Disaggregation Approach Simulation Approach Manageable Model Size Policy Implementation Summary
Appendix B Structured Interview Questionnaire and Participants
Structured Interview Questionnaire
Appendix C Respondent’s Mean Scores of Importance
Index
  • ← Prev
  • Back
  • Next →
  • ← Prev
  • Back
  • Next →

Chief Librarian: Las Zenow <zenow@riseup.net>
Fork the source code from gitlab
.

This is a mirror of the Tor onion service:
http://kx5thpx2olielkihfyo4jgjqfb7zx7wxr3sd4xzt26ochei4m6f7tayd.onion