Image

Index

A

absorption ratings, 16, 17

accent strips, 161–163

accessibility

curbless showers/wet rooms and, 114–119

threshold transitions for, 43

acrylic fortifier, 36

adjustable grate plates, 116–118

American National Standards Institute, 16, 17

Americans with Disabilities Act (ADA), 16

angle grinders

cementboard cutting and, 40–41

for cutting tile, 52

anti-fracture membranes, 42

asbestos

resilient flooring removal and, 64

underlayment removal and, 68

asphalt roofing felt, 137

B

backer boards, 38, 83. See also cementboard

backsplashes

countertops and, 172

mosaic tile, 186–189

style ideas, 129

tile options for, 173

See also countertops

baseboards, removing, 61

bathrooms

curbless showers/wet rooms and, 114–119

custom shower bases

about, 106

building, 107, 109–110

deck mud for, 108

installing, 110–113

sinks, removing, 63

style ideas, 8, 10, 12, 13, 25, 57, 126–128

toilets, removing, 62

tub apron tile installation, 150–155

tub surround installation, 144, 146–149

vanities, removing, 63

bathtubs

style ideas, 126

tub apron tile installation, 150–155

tub surround installation, 144, 146–149

buff rags, 53

building codes

curbless showers/wet rooms and, 116

custom shower bases and, 106

radiant floors and, 80

shower enclosures and, 73

tiled steps and, 196

bullnose base tile, 89

bullnose edging, 178

buying tile

estimating floor tile needs, 22

estimating trim tile needs, 22

estimating wall tile needs, 22

suggestions for, 23

C

carpenter’s squares, 51

carpet

removing, 67

transitions to, 43

caulk

expansion joints and, 143

grout and, 46

replacing, 229

caulk guns, 53, 207

cementboard

about, 38

cutting, 40–41

fasteners for, 39, 71

floor underlayment installation, 71

safety and, 40

scoring and snapping, 40–41

thinset and, 44, 45

wall installation, 136–137

cementboard knives, 50

cementboard mesh tape, 39

cementboard screws, 39

cement body tile, 21

center punch, 31

ceramic subway tile, 13

ceramic tiles

basic installation

backer board installation, 83

cutting tiles, 86

grouting, 87–88

laying out tile, 83–86

reference lines for, 83

sealing, 88

threshold transitions, 88

glazed, 18

removing from floors, 66

removing from walls, 133

chalklines, 51

chimney flue tiles, 208

chisels, 48, 220

circular saws, 49, 72

cleaning, 230

coefficient of friction numbers, 16

cold chisels, 48

color variations, multiple boxes and, 23

combination squares, 30

concrete resurfacer, 36

coping saws, 52

cork tile style ideas, 10

countertops

building, 176–178

corner variations, 184

edge options, 173

granite tile installation, 182–185

installing tile, 178–181

kitchen island, bi-level, 191–193

laying out tile on, 175

removing existing, 183

sink cutouts, 183

typical construction, 173

See also backsplashes

crack isolation membranes, 42, 73

curbless showers

about, 114

installation, 116–119

typical construction, 115

cutting tile

holes, 30–31

irregular notches, 29

mosaic tiles, 30

nippers

safety and, 26

square notches and, 28

using, 29

porcelain, 102

rod saws, 26, 28

safety and, 26

square notches, 27–28

tile cutter safety, 26

tools for, 52

tungsten carbide hole saws, 31

wet tile saws

irregular notches and, 29

porcelain and, 102

safety and, 26

square notches and, 28

using, 27

D

deck mud, 108

diamond blades, 52

door jams, preparing, 61

drains, custom shower bases and, 110–113

drills, 31, 47, 49

dry pack mortar, 108

dry-set thinset mortar, 44. See also thinset mortar

drywall. See wallboard

drywall squares, 50

E

ear protection, 34

electric wire fault indicators, 78

end-cutting nippers, 48, 67

F

fasteners

for cementboard, 39, 71

underlayment removal and, 68

faux wood tile, 8, 11, 126

fireplaces

mantel casing installation, 169

mantel installation, 165

style ideas, 129

tile surround, 164–166

tile surround with wood border, 167–169

first aid kits, 35

flat pry bars, 48

floor covering

assessing existing, 61

removing

about, 64

adhesive, 66

asbestos and, 64

carpet, 67

ceramic tile, 66

sheet vinyl, 65

underlayment, 64, 66, 68–69

vinyl tile, 66

floor leveler, applying, 36–37

floor mud, 108

floor-patching compound, 72

floor resurfacer, 36

floors

anatomy of, 60

preparing, 60–61

radiant floors

connecting, 81

electrical service requirements, 76, 77, 78, 79

installation, 78–81

subfloor and, 76

See also floor covering; shower bases, custom; underlayment

floor scrapers, 48, 64

floor tiles

about, 16

countertops and, 172

curbless showers/wet rooms and, 114–119

custom shower bases and

about, 106

building, 107, 109–110

deck mud for, 108

installing, 110–113

estimating amount needed, 22

glass mosaic installation, 96–99

installing

backer board installation, 83

cutting tiles, 86

grouting, 87–88

laying out tile, 83–86

reference lines for, 83

sealing, 88

threshold transitions, 88

porcelain snap-lock, 100–103

ratings for, 16

regrouting, 223

replacing, 221

resilient tile, 120–123

self-leveling systems, 104–105

style ideas, 8, 9, 56–59

foam brushes, 53

fortifier, 36

fountain, ceramic tile

construction of, 208–209

creating, 210–211

foyers, style ideas, 58

framing

building countertops, 176–178

custom shower bases, 107, 109–110

fireplaces

mantel casing installation, 169

mantel installation, 165

garden bench, 215–217

kitchen island, bi-level, 191–192

tiled wall niche, 157–158

friction ratings, 16

G

galvanized metal, 107, 109

garden bench, 214–217

GFCI circuits, radiant floors and, 76–78

GFCI receptacles, 35

glass tile

about, 18, 24

color variations and, 96

mastic for, 24

mosaic tile, 24, 96

mosaic tile floor installation, 96–99

style ideas, 9, 24–25

thinset mortar and, 44

wear and, 24

granite tiles

countertop installation, 182–185

sink cutouts, 183

style ideas, 58

grinders, 52

grout

carbide-blade grout tools, 222

cleaning products and, 230

floor tile installation and, 87–88

mixing, 47, 87

porous tile and, 207

thinset and color of, 44

tile spacing and, 46

types of, 46

wall tile and, 140

grout colorant, 224–225

grout floats, 46, 53

grout sealers

about, 46

applicators for, 53

grout sponges, 46, 53

grout tools, 222

H

hand mauls, 48

heat guns, 48

holes

cutting, 31

marking for cutting, 30

patching wall, 131

hole saws, 40–41

I

irregular notches, 29

isolation membrane, 196, 198

J

jamb saws, 61

jigsaws

cementboard cutting and, 40–41

square notches and, 28

for substrate work, 49

K

kitchen islands

building a bi-level, 191–192

corners of, 184

options for, 190

tiling, 192–193

kitchen style ideas, 13, 56–58

knee pads, 34

L

latex additive

for floor leveler, 36

for grout, 46

for thinset mortar, 44

latex gloves, 34

latex grout fortifier, 46

latex leveler fortifier, 36

latex-modified grout, 46. See also grout

latex-modified thinset mortar, 44. See also thinset mortar

layout lines, 120

leveler, applying, 36–37

levels, 51

low-voltage lighting system, 209–211

M

maintenance, 220, 230. See also repairs

marble tile style ideas, 10

margin trowels, 46

masks, 34

masonry chisels, 48

medallions, installing, 90–95

metal tile, 19

mirrored tile, 12, 129

modified thinset, 44. See also thinset mortar

mosaic tile

about, 20

backsplash, 186–189

color variations and, 96

cutting, 30

installing floor glass, 96–99

obstacles and, 99

outdoor fountain

construction of, 208–209

creating, 210–211

sealing, 99

style ideas, 13

multimeters, 76, 79–80

N

needlenose pliers, 53

niches

style ideas, 8, 10

tiled wall niche, 157–159

nippers

safety and, 26

square notches and, 28

using, 29

notches, cutting

irregular, 29

square, 27–28

O

obstacles, floor glass mosaic installation, 99

outdoor tile

concrete steps

preparing, 196–197

tiling, 198–201

cutting contours in, 205

frost ratings, 17

garden bench, 214–217

grouting porous, 207

mosaic planters, 212–213

patios

grouting/sealing, 206–207

laying out tile, 203–205

surfaces for, 202

style ideas, 11

tile fountain, 208–211

outlets, 35

P

painted tile, 126–127

paper templates, 29

patios

grouting/sealing, 206–207

laying out tile, 203–205

surfaces for, 202

PEI ratings, 16, 17

planters, mosaic, 212–213

plaster, removing, 133

plywood, 72

polyethylene sheeting, 136–137

polymer-modified grout, 46. See also grout

polymer-modified thinset mortar, 44, 45. See also thinset mortar

Porcelain Enamel Institute (PEI), 16, 17

porcelain tiles

about, 18

basic installation

backer board installation, 83

cutting tiles, 86

grouting, 87–88

laying out tile, 83–86

reference lines for, 83

sealing, 88

threshold transitions, 88

faux wood, 8, 11

snap-lock tiles

advantages of, 100

cutting, 102

installation, 101–103

replacing damaged, 103

style ideas, 8, 11, 13, 56

portable drills, 49

power drills, 31, 47, 49

primer, leveler and, 36–37

pry bars, 48

Q

quality gradings, 16, 17

R

radiant floors

connecting, 81

electrical service requirements, 76, 77, 78, 79

installation, 78–81

subfloors and, 76

repairs

about, 219

accessories

replacing built-in, 227

replacing surface mounted, 227

grout colorant, 224–225

heavy stains, 230

regrouting

floor tile, 223

importance of, 220, 226

tools for, 222

wall tile, 226

replacing caulk, 229

replacing damaged tiles

floor, 221

porcelain snap-lock, 103

wall, 228

resilient tile, 120–123

respirators, 34

resurfacer, 36

rod saws, 26, 28

rotary tool, 40–41

rubber gloves, 34

rubber mallets, 53

S

safety

basics, 34–35

cementboard and, 40

cutting tile and, 26

first aid kits, 35

with hammer and chisel, 220

safety equipment, 34

safety goggles/glasses, 34

scoring tool, 40–41

sealant

mosaic tile and, 99

testing, 230

tile appearance and, 17

self-leveling systems, 104–105

self-leveling underlayment

about, 36

applying, 36–37

mixing, 36

sheet vinyl flooring, removing, 65

shower bases, custom

about, 106

building, 107, 109–110

deck mud for, 108

installing, 110–113

shower enclosures, membranes and, 73

shower pan liner, 42

silicone grout sealers. See grout sealers

sinks, removing, 63

snap cutters

resilient tile and, 123

using, 26

snap-lock porcelain tiles

advantages of, 100

cutting, 102

installation, 101–103

replacing damaged, 103

soap niches, 8

sound isolation membranes, 42

spacers, 30, 53

spackle, 131

square notches

cutting options, 28

marking, 27

stain removal poultice, 230

stairs, concrete

preparing, 196–197

tiling, 198–201

stone tiles

basic installation

backer board installation, 83

cutting tiles, 86

grouting, 87–88

laying out tile, 83–86

reference lines for, 83

sealing, 88

threshold transitions, 88

stone floor with medallion, 90–95

style ideas, 11

straightedges, 49, 51

style ideas

accent strips, 163

backsplashes, 129

bathrooms, 8, 10, 12, 13, 25, 57, 126–128

fireplaces, 129

floor tile, 8, 9, 56–59

foyers, 58

glass tile, 9, 24–25

kitchens, 13, 56–58

porcelain tiles, 8, 11, 13, 56

terra cotta tile, 11

wall tile, 8–10, 13, 126–129

wood tiles, 13

T

tape measures, 51

terra cotta tile, 11, 20

thinset mortar

cementboard and, 39, 45

glass tile and color of, 44

grout color and, 44

mixing, 45, 47

premixed, 45

radiant floor installation and, 81

safety equipment and, 34

trowel size and, 45

types of, 44

tile cutters, 26, 52

tile membranes

curbless showers/wet rooms and, 114–115

for custom shower base, 110–112

installing, 74–75

types of, 42, 73

tile spacers, 30, 53

tile stones, 52

tile types, 18–21

T-molding, 43

toilets, removing, 62

tools

for applying grout, 46

for cementboard cutting, 40–41

for cutting tile, 52

for regrouting, 222

setting and grouting, 53

sharpness of, 35, 64

for substrate installation, 50

for substrate work, 49

for surface removal, 48

for tile layout, 51

See also nippers; snap cutters; wet tile saws

transition strips

about, 43

floor tile installation and, 88

trim tiles

about, 21

backsplashes and, 173

bullnose base installation, 89

bullnose edging, 187

countertop edges, 173, 178, 180

estimating need, 22

wall installation, 142

trowels, 50, 53

tub-and-tile caulk, 46

tungsten carbide hole saws, 31

U

uncoupling membranes, 42, 73

underlayment

flooring removal and, 66

installing floor cementboard, 71

installing floor plywood, 72

materials for floor, 70

removing, 68–69

utility knives

for substrate installation, 50

V

vanities, removing, 63

vinyl tile flooring

removing, 66

resilient tile, 120–123

style ideas, 9

W

wallboard

installing, 134–135

removing, 132

walls

cementboard installation, 136–137

checking plumb, 138

correcting out-of-plumb, 131

measuring, 138

patching holes in, 131

preparing, 130

removing plaster, 133

wallboard

installing/finishing, 134–135

removing, 132

wall tile

about, 17

accent strip, 161–163

accessories, replacing, 227

estimating amount needed, 22

fireplaces

tile surround, 164–166

tile surround with wood border, 167–169

grouting/sealing, 143

grout lines and, 140

hanging substrate for, 134–137

layouts for, 138–139

ratings for, 17

regrouting, 226

replacing damaged, 228

setting, 141–142

style ideas, 8, 9, 10, 13, 126–129

tiled wall niche, 157–159

trim tiles, 142

tub apron tile installation, 150–155

tub surround installation, 144, 146–149

water absorption ratings, 16, 17

waterproofing membranes

about, 42, 73

curbless showers/wet rooms and, 114–115

custom shower base and, 110–112

installing, 74–75

waterproof sealant, 75

wet rooms

about, 114

installation, 116–119

typical construction, 115

wet tile saws

irregular notches and, 29

safety and, 26

square notches and, 28

using, 27

wheelchair use

curbless showers/wet rooms, 114–119

transitions for, 43

wiring, 34–35

wood tiles, 13, 19

work gloves, 34